A manufacturer may have reliable backups of its servers and business data, yet still face a difficult decision during an outage: which systems need to come back online first?

The answer matters when production teams depend on ERP software for work orders, warehouses need inventory data to fulfill shipments, and employees cannot access documents required to complete customer orders.

Restoring systems in the wrong order can delay the return to normal operations, even when the underlying data is recoverable.

A manufacturing IT disaster recovery plan should identify critical business processes, the technology each process depends on, acceptable recovery times, and the sequence in which systems need to be restored.

For manufacturers preparing their 2027 IT budgets, reviewing those priorities can help identify gaps in backup coverage, supporting infrastructure, and recovery planning.

Manufacturing cybersecurity recovery is receiving more attention

In May 2026, the National Institute of Standards and Technology (NIST) published a draft guide titled Responding to and Recovering from a Cyber Attack: Cybersecurity for the Manufacturing Sector.

The guide examines incident response and recovery in manufacturing environments, including the challenges associated with industrial control systems.

NIST's work reflects a practical concern: manufacturers need plans and capabilities to respond to cybersecurity incidents and restore operations.

In September 2026, NIST also released an updated draft of its Guide to Operational Technology Security, expanding its discussion of asset management, governance, monitoring, and operational technology risk.

These documents are draft guidance, not newly enacted requirements for all manufacturers.

They provide useful context for understanding how cybersecurity risk management connects to operational reliability.

A business IT recovery plan can complement specialized production-system recovery planning by identifying which applications, infrastructure, and information employees need to resume work.

Start with the business processes that need to resume

A manufacturer cannot establish meaningful recovery priorities by looking only at a list of servers.

The IT team needs input from the people responsible for production planning, inventory, shipping, finance, and other essential operations.

For example, restoring email may be important for communication, but an ERP application might be necessary before production coordinators can retrieve current work orders.

At another facility, access to engineering files may be the immediate priority because production cannot proceed without approved drawings or specifications.

The sequence depends on the manufacturer's operations.

Start by identifying the processes that would create the greatest disruption if unavailable.

Common examples include:

  • Production scheduling and work-order management.
  • Inventory visibility and material availability.
  • Access to engineering drawings and production documentation.
  • Shipping, receiving, and order fulfillment.
  • Financial transactions and purchasing.
  • Communication with employees, suppliers, and customers.

For each process, document the technology required and how long the business could reasonably operate without it.

This is part of a business impact analysis, which helps translate technology availability into operational consequences.

Understand the systems that must recover together

An application may depend on several supporting services before employees can use it.

Consider a hypothetical manufacturer whose ERP application depends on a database server, network connectivity, centralized authentication, and shared file storage.

The ERP application cannot necessarily return to normal operation until those dependencies are available.

This is why a recovery plan should document relationships between systems.

Business process

Primary system

Supporting dependencies

Production scheduling

ERP or manufacturing management application

Database, network, authentication

Inventory management

Inventory application

Database, wireless connectivity, user accounts

Engineering collaboration

Document management or file storage

Network, identity services, file access

Shipping and fulfillment

Order-processing application

Database, network, printers and connected services

Purchasing and administration

Financial applications

Identity, connectivity, vendor-hosted services

These are illustrative examples. Actual dependencies differ by facility and technology environment.

This information can reveal a critical weakness: a business application may have a reliable backup, while another system required to access it does not have an adequate recovery arrangement.

Manufacturers should also distinguish business IT from operational technology.

Industrial control systems and production equipment have specialized safety, reliability, and recovery requirements. Restoration activities involving those systems should be planned with qualified OT personnel and equipment vendors.

Set realistic recovery time and data-loss objectives

Two concepts help manufacturers turn recovery expectations into measurable requirements.

Recovery Time Objective (RTO) is the target amount of time within which a system or process should be restored following a disruption.

Recovery Point Objective (RPO) is the maximum acceptable amount of data loss measured in time.

For example, a manufacturer might determine that an order-processing system needs to be restored within several hours, while a less critical administrative application can tolerate a longer interruption.

The company may also decide that losing an entire day of updated inventory transactions would create an unacceptable operational problem.

Those decisions influence backup frequency, system architecture, recovery capabilities, and cost.

The right objectives depend on business requirements. They should be established through discussion between IT and operational leadership rather than chosen solely on the basis of what a backup product offers.

Recovery targets are also different from guarantees. A documented objective needs to be supported by appropriate technology, testing, and procedures.

Test whether backups can support the recovery plan

A successful backup job does not establish that an entire business process can be restored within its required timeframe.

Manufacturers should understand what is included in their backups, how restoration works, and which services must be recovered together.

Testing may reveal that a database can be restored but an application requires additional configuration. It may identify missing credentials, outdated procedures, or dependencies that were never documented.

A recovery exercise should evaluate:

  • Whether critical data and systems are included in backup arrangements.
  • Whether backups are protected from unauthorized modification or deletion.
  • Whether restoration procedures have been tested.
  • Whether necessary credentials and instructions are available during an outage.
  • Whether recovery results meet documented business requirements.
  • Which issues need correction before the next exercise.

Organizations should coordinate recovery testing carefully to avoid unnecessary disruption to production.

The results should be documented, including unresolved gaps and assigned follow-up actions.

Include third-party providers in manufacturing recovery planning

Many manufacturers depend on outside organizations for cloud-hosted ERP systems, business applications, network services, or backup infrastructure.

These providers may be responsible for different parts of the recovery process.

For a cloud-hosted application, the vendor may manage its underlying infrastructure while the customer remains responsible for user permissions, certain data protections, and internal continuity procedures.

Responsibilities vary by service and contract.

A manufacturer should understand:

  • Which services the vendor is responsible for restoring.
  • What recovery commitments are included in the agreement.
  • How incidents and outages will be communicated.
  • Which customer actions may be necessary.
  • Whether an alternate process is available during an extended outage.

The recovery plan should include vendor contact information and escalation procedures that remain accessible when normal systems are unavailable.

Assign recovery decisions before an incident

When several systems are unavailable, decisions may need to be made quickly.

IT staff may understand technical restoration requirements, while operations leaders understand which delays would create the greatest business impact.

An effective plan identifies who can authorize recovery actions, approve operational workarounds, and communicate changes across the business.

For example, a manufacturing company might assign responsibility for infrastructure restoration to its IT team, operational priorities to its COO, and production-equipment recovery to qualified plant or OT personnel.

The specific structure will vary.

What matters is that responsibilities are established before an incident creates time pressure.

A practical manufacturing recovery-readiness review

Manufacturing leadership can use the following questions when reviewing its disaster recovery plan:

Review area

Question for leadership

Critical operations

Have we identified the business processes that must resume first?

Technology dependencies

Do we know which systems each process requires?

Recovery objectives

Have we defined acceptable downtime and data loss?

Backup coverage

Are important applications, data, and supporting services protected?

Recovery testing

Have we tested restoration and documented the results?

Vendor dependencies

Do we understand provider responsibilities and escalation contacts?

Accountability

Are recovery decisions and technical responsibilities assigned?

A company may discover that its greatest recovery concern is a single aging server, an undocumented application dependency, or an important service without a tested restoration procedure.

The findings can help leadership prioritize IT improvements and budget decisions according to operational impact.

How AvTek supports manufacturing IT recovery planning

AvTek Solutions provides Managed IT, Co-Managed IT, backup and disaster recovery, and cybersecurity risk-management services for growing businesses, including manufacturers.

Through Managed IT Services, AvTek supports business IT infrastructure, proactive monitoring, system maintenance, and backup and recovery needs.

For manufacturers with internal IT personnel, Co-Managed IT Services can provide additional support for server backup and recovery, infrastructure management, and strategic IT planning.

AvTek's vCISO Services also help organizations evaluate technology risks, prioritize remediation, and review incident-response planning.

These services can help manufacturers improve the resilience of their supporting business IT environment. Specialized industrial control system recovery should be coordinated with appropriate OT and equipment specialists.

Make recovery priorities part of your 2027 IT planning

Manufacturers preparing technology budgets should review whether their recovery arrangements reflect the way their operations depend on IT today.

New business applications, infrastructure changes, additional locations, and vendor relationships may all affect recovery needs.

A useful starting point is to select one critical business process, map the systems it depends on, and determine whether those systems can be restored within an acceptable timeframe.

That exercise can reveal practical priorities for IT investments, testing, and documentation.

If your manufacturing business needs help evaluating its IT recovery capabilities or identifying cybersecurity and technology risks, AvTek can help assess the supporting environment and develop a plan for improvement.

Talk with AvTek about manufacturing IT resilience and recovery planning.